Original Post
Ok here''s my issue-
I have a program where specific dates are stored in an array.
What I need to do is take the system date and see if 90 days have
elapsed. If so, I need to remove that date from the array and
move everything forward. The major problem I''m having is
determining the number of days between date a (the stored date) and date b (the current system date). Can anyone point me in the
right direction or provide me some code to go by?
Thanks in advance